HASTINGS JUTE MILL (A DIVN. OF M.R.EXPORTS LTD.) 
FORTNIGHT PERIOD: 14/05/2010 TO 27/05/2010 RUN DATE: 11/06/2010
DEPT CODE & NAME: 9 BEAMING
PAGE NO.: 1
| DEP | SEC | SFT | M/C | QUAL. CODE | DESCRIPTION   | LAID LEN. | PROD | QLTY | BASIC |
9 1 A H01 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  23.00  6.6150  2.51
I002 H BEAM 375 TO 424 L/L 100 Yds. 165  5.00  7.0875  0.58
I003 H BEAM 425 TO 474 L/L 100 Yds. 165  341.00  7.5600  42.54
I004 H BEAM 475 TO 524 L/L 100 Yds. 165  21.00  8.0325  2.78
I006 H BEAM 575 TO 624 L/L 100 Yds. 165  142.00  8.9775  21.03
M/C WISE TOTAL: 69.44
H02 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  145.00  6.6150  15.83
I002 H BEAM 375 TO 424 L/L 100 Yds. 970  8.50  7.0875  5.84
I002 H BEAM 375 TO 424 L/L 100 Yds. 165  59.50  7.0875  6.96
I003 H BEAM 425 TO 474 L/L 100 Yds. 165  109.00  7.5600  13.60
I004 H BEAM 475 TO 524 L/L 100 Yds. 165  15.00  8.0325  1.99
I006 H BEAM 575 TO 624 L/L 100 Yds. 165  8.00  8.9775  1.19
M/C WISE TOTAL: 45.41
H03 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  5.00  6.6150  0.55
I003 H BEAM 425 TO 474 L/L 100 Yds. 165  3.00  7.5600  0.37
I006 H BEAM 575 TO 624 L/L 100 Yds. 165  158.00  8.9775  23.40
I007 H BEAM 625 TO 674 L/L 100 Yds. 170  10.00  9.4500  1.61
I007 H BEAM 625 TO 674 L/L 100 Yds. 165  18.00  9.4500  2.81
I008 H BEAM 675 TO 724 L/L 100 Yds. 620  19.50  9.9225  12.00
I008 H BEAM 675 TO 724 L/L 100 Yds. 165  4.50  9.9225  0.74
I009 H BEAM 725 TO 774 L/L 100 Yds. 165  6.00  10.395  1.03
I009 H BEAM 725 TO 774 L/L 100 Yds. 620  4.50  10.395  2.90
I010 H BEAM 775 TO 824 L/L 100 Yds. 175  18.00  10.8675  3.42
I010 H BEAM 775 TO 824 L/L 100 Yds. 165  24.00  10.8675  4.30
I011 H BEAM 825 TO 874 L/L 100 Yds. 175  4.00  11.34  0.79
I011 H BEAM 825 TO 874 L/L 100 Yds. 165  8.00  11.34  1.50
I013 H BEAM 925 & ABOVE L/L100 Yds. 620  2.00  12.285  1.52
M/C WISE TOTAL: 56.94
H04 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  10.00  6.6150  1.09
I002 H BEAM 375 TO 424 L/L 100 Yds. 165  28.00  7.0875  3.27
I003 H BEAM 425 TO 474 L/L 100 Yds. 165  179.00  7.5600  22.33
I004 H BEAM 475 TO 524 L/L 100 Yds. 165  352.00  8.0325  46.65
M/C WISE TOTAL: 73.34
H05 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  180.00  6.6150  26.20
M/C WISE TOTAL: 26.2
H06 165  20.00  6.6150
I001 H BEAM 000 TO 374 L/L 100 Yds.  2.18
I005 H BEAM 525 TO 574 L/L 100 Yds. 165  35.00  8.5050  4.91
I006 H BEAM 575 TO 624 L/L 100 Yds. 165  30.00  8.9775  4.44
I006 H BEAM 575 TO 624 L/L 100 Yds. 620  30.00  8.9775  16.70
I008 H BEAM 675 TO 724 L/L 100 Yds. 170  20.00  9.9225  3.37
M/C WISE TOTAL: 31.6
H07 I001 H BEAM 000 TO 374 L/L 100 Yds. 170  7.00  6.6150  0.79
I001 H BEAM 000 TO 374 L/L 100 Yds. 165  475.00  6.6150  51.85
I002 H BEAM 375 TO 424 L/L 100 Yds. 165  295.00  7.0875  34.50
M/C WISE TOTAL: 87.14
H08 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  317.00  6.6150  46.13
I005 H BEAM 525 TO 574 L/L 100 Yds. 165  4.00  8.5050  0.75
M/C WISE TOTAL: 46.88
SHIFT TOTAL: 436.95
B H01 I002 H BEAM 375 TO 424 L/L 100 Yds. 165  25.00  7.0875  2.92
I003 H BEAM 425 TO 474 L/L 100 Yds. 165  388.00  7.5600  48.40

HASTINGS JUTE MILL (A DIVN. OF M.R.EXPORTS LTD.) 
FORTNIGHT PERIOD: 14/05/2010 TO 27/05/2010 RUN DATE: 11/06/2010
DEPT CODE & NAME: 9 BEAMING
PAGE NO.: 2
| DEP | SEC | SFT | M/C | QUAL. CODE | DESCRIPTION   | LAID LEN. | PROD | QLTY | BASIC |
9 1 B H01 I004 H BEAM 475 TO 524 L/L 100 Yds. 165  7.00  8.0325  0.93
I006 H BEAM 575 TO 624 L/L 100 Yds. 165  88.00  8.9775  13.04
M/C WISE TOTAL: 65.29
H02 165  65.00  6.6150
I001 H BEAM 000 TO 374 L/L 100 Yds.  7.09
I002 H BEAM 375 TO 424 L/L 100 Yds. 165  82.00  7.0875  9.59
I002 H BEAM 375 TO 424 L/L 100 Yds. 970  8.00  7.0875  5.50
I003 H BEAM 425 TO 474 L/L 100 Yds. 165  75.00  7.5600  9.36
I004 H BEAM 475 TO 524 L/L 100 Yds. 165  11.00  8.0325  1.46
M/C WISE TOTAL: 33
H03 I003 H BEAM 425 TO 474 L/L 100 Yds. 165  12.00  7.5600  1.50
I006 H BEAM 575 TO 624 L/L 100 Yds. 165  126.00  8.9775  18.66
I008 H BEAM 675 TO 724 L/L 100 Yds. 170  28.00  9.9225  4.72
I008 H BEAM 675 TO 724 L/L 100 Yds. 620  29.00  9.9225  17.84
I009 H BEAM 725 TO 774 L/L 100 Yds. 620  9.50  10.395  6.12
I010 H BEAM 775 TO 824 L/L 100 Yds. 175  59.00  10.8675  11.22
I011 H BEAM 825 TO 874 L/L 100 Yds. 175  3.00  11.34  0.60
M/C WISE TOTAL: 60.66
H04 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  9.00  6.6150  0.98
I002 H BEAM 375 TO 424 L/L 100 Yds. 165  44.00  7.0875  5.15
I003 H BEAM 425 TO 474 L/L 100 Yds. 165  68.00  7.5600  8.48
I004 H BEAM 475 TO 524 L/L 100 Yds. 165  321.00  8.0325  42.54
M/C WISE TOTAL: 57.15
H05 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  725.00  6.6150  105.51
M/C WISE TOTAL: 105.51
H06 I003 H BEAM 425 TO 474 L/L 100 Yds. 165  24.00  7.5600  2.99
I005 H BEAM 525 TO 574 L/L 100 Yds. 165  45.00  8.5050  6.31
I006 H BEAM 575 TO 624 L/L 100 Yds. 165  30.00  8.9775  4.44
I008 H BEAM 675 TO 724 L/L 100 Yds. 170  14.00  9.9225  2.36
M/C WISE TOTAL: 16.1
H07 I002 H BEAM 375 TO 424 L/L 100 Yds. 165  32.00  7.0875  3.74
M/C WISE TOTAL: 3.74
H08 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  249.00  6.6150  36.24
M/C WISE TOTAL: 36.24
SHIFT TOTAL: 377.69
C H01 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  25.00  6.6150  2.73
I002 H BEAM 375 TO 424 L/L 100 Yds. 165  40.00  7.0875  4.68
I002 H BEAM 375 TO 424 L/L 100 Yds. 970  2.00  7.0875  1.37
I003 H BEAM 425 TO 474 L/L 100 Yds. 165  378.00  7.5600  47.15
I006 H BEAM 575 TO 624 L/L 100 Yds. 165  78.00  8.9775  11.55
M/C WISE TOTAL: 67.48
H02 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  69.00  6.6150  7.53
I002 H BEAM 375 TO 424 L/L 100 Yds. 165  46.00  7.0875  5.38
I002 H BEAM 375 TO 424 L/L 100 Yds. 970  2.00  7.0875  1.37
I003 H BEAM 425 TO 474 L/L 100 Yds. 165  47.00  7.5600  5.86
I004 H BEAM 475 TO 524 L/L 100 Yds. 165  18.00  8.0325  2.39
M/C WISE TOTAL: 22.53
H03 I003 H BEAM 425 TO 474 L/L 100 Yds. 165  41.00  7.5600  5.11
I006 H BEAM 575 TO 624 L/L 100 Yds. 165  175.00  8.9775  25.92
I008 H BEAM 675 TO 724 L/L 100 Yds. 620  31.00  9.9225  19.07
I008 H BEAM 675 TO 724 L/L 100 Yds. 165  1.00  9.9225  0.16
I008 H BEAM 675 TO 724 L/L 100 Yds. 170  26.00  9.9225  4.39

HASTINGS JUTE MILL (A DIVN. OF M.R.EXPORTS LTD.) 
FORTNIGHT PERIOD: 14/05/2010 TO 27/05/2010 RUN DATE: 11/06/2010
DEPT CODE & NAME: 9 BEAMING
PAGE NO.: 3
| DEP | SEC | SFT | M/C | QUAL. CODE | DESCRIPTION   | LAID LEN. | PROD | QLTY | BASIC |
9 1 C H03 I009 H BEAM 725 TO 774 L/L 100 Yds. 620  2.50  10.395  1.61
I010 H BEAM 775 TO 824 L/L 100 Yds. 175  21.00  10.8675  3.99
I011 H BEAM 825 TO 874 L/L 100 Yds. 175  22.00  11.34  4.37
M/C WISE TOTAL: 64.62
H04 I002 H BEAM 375 TO 424 L/L 100 Yds. 165  47.00  7.0875  5.50
I003 H BEAM 425 TO 474 L/L 100 Yds. 165  243.00  7.5600  30.31
I004 H BEAM 475 TO 524 L/L 100 Yds. 165  202.00  8.0325  26.77
M/C WISE TOTAL: 62.58
H05 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  698.00  6.6150  101.58
M/C WISE TOTAL: 101.58
H07 I001 H BEAM 000 TO 374 L/L 100 Yds. 165  469.00  6.6150  51.19
I001 H BEAM 000 TO 374 L/L 100 Yds. 170  3.00  6.6150  0.34
I002 H BEAM 375 TO 424 L/L 100 Yds. 165  236.00  7.0875  27.60
M/C WISE TOTAL: 79.13
SHIFT TOTAL: 397.92
SECTION TOTAL: 1212.56
4 A S01 I053 S BEAM 400 To 474 L/L 100 Yds. 130  1068.00  8.2000  113.85
M/C WISE TOTAL: 113.85
S02 I053 S BEAM 400 To 474 L/L 100 Yds. 130  36.00  8.2000  3.84
I054 S BEAM 475 To 549 L/L 100 Yds. 130  1019.00  8.8300  116.97
M/C WISE TOTAL: 120.81
S03 I053 S BEAM 400 To 474 L/L 100 Yds. 130  936.00  8.2000  99.78
I054 S BEAM 475 To 549 L/L 100 Yds. 130  145.00  8.8300  16.64
M/C WISE TOTAL: 116.42
S04 I053 S BEAM 400 To 474 L/L 100 Yds. 130  1020.00  8.2000  108.73
M/C WISE TOTAL: 108.73
S05 I053 S BEAM 400 To 474 L/L 100 Yds. 130  1062.00  8.2000  113.21
M/C WISE TOTAL: 113.21
S07 I053 S BEAM 400 To 474 L/L 100 Yds. 130  996.00  8.2000  106.17
I054 S BEAM 475 To 549 L/L 100 Yds. 130  78.00  8.8300  8.95
M/C WISE TOTAL: 115.12
S08 I051 S BEAM 001 TO 324 L/L 100 Yds. 130  54.00  6.9400  4.87
I053 S BEAM 400 To 474 L/L 100 Yds. 130  970.00  8.2000  103.40
M/C WISE TOTAL: 108.27
SHIFT TOTAL: 796.41
B S BEAM 400 To 474 L/L 100 Yds. 130  900.00  8.2000
S01 I053  95.94
M/C WISE TOTAL: 95.94
S02 I053 S BEAM 400 To 474 L/L 100 Yds. 130  234.00  8.2000  24.94
I054 S BEAM 475 To 549 L/L 100 Yds. 130  672.00  8.8300  77.14
M/C WISE TOTAL: 102.08
S03 I053 S BEAM 400 To 474 L/L 100 Yds. 130  828.00  8.2000  88.26
I054 S BEAM 475 To 549 L/L 100 Yds. 130  71.00  8.8300  8.15
M/C WISE TOTAL: 96.41
S04 130  780.00  8.2000
I053 S BEAM 400 To 474 L/L 100 Yds.  83.15
M/C WISE TOTAL: 83.15
S05 I053 S BEAM 400 To 474 L/L 100 Yds. 130  900.00  8.2000  95.94
M/C WISE TOTAL: 95.94
S07 I053 S BEAM 400 To 474 L/L 100 Yds. 130  906.00  8.2000  96.58
M/C WISE TOTAL: 96.58
S08 I053 S BEAM 400 To 474 L/L 100 Yds. 130  924.00  8.2000  98.50
M/C WISE TOTAL: 98.5

HASTINGS JUTE MILL (A DIVN. OF M.R.EXPORTS LTD.) 
FORTNIGHT PERIOD: 14/05/2010 TO 27/05/2010 RUN DATE: 11/06/2010
DEPT CODE & NAME: 9 BEAMING
PAGE NO.: 4
| DEP | SEC | SFT | M/C | QUAL. CODE | DESCRIPTION   | LAID LEN. | PROD | QLTY | BASIC |
9 4 B SHIFT TOTAL: 668.6
C S01 I053 S BEAM 400 To 474 L/L 100 Yds. 130  984.00  8.2000  104.89
M/C WISE TOTAL: 104.89
S02 130  174.00  8.2000
I053 S BEAM 400 To 474 L/L 100 Yds.  18.55
I054 S BEAM 475 To 549 L/L 100 Yds. 130  780.00  8.8300  89.54
M/C WISE TOTAL: 108.09
S03 I053 S BEAM 400 To 474 L/L 100 Yds. 130  840.00  8.2000  89.54
I054 S BEAM 475 To 549 L/L 100 Yds. 130  143.00  8.8300  16.41
M/C WISE TOTAL: 105.95
S04 I053 S BEAM 400 To 474 L/L 100 Yds. 130  846.00  8.2000  90.18
M/C WISE TOTAL: 90.18
S05 130  978.00  8.2000
I053 S BEAM 400 To 474 L/L 100 Yds.  104.25
M/C WISE TOTAL: 104.25
S07 I053 S BEAM 400 To 474 L/L 100 Yds. 130  942.00  8.2000  100.42
M/C WISE TOTAL: 100.42
S08 I053 S BEAM 400 To 474 L/L 100 Yds. 130  1074.00  8.2000  114.49
M/C WISE TOTAL: 114.49
SHIFT TOTAL: 728.27
SECTION TOTAL: 2193.28
GRAND TOTAL: 3405.84